Milano Tiling & Waterproofing
Underfloor heating supplied and installed beneath new tiled floors

Underfloor Heating

Underfloor heating cable laid out in an even grid before screeding, ready for tiling

Cold tile floors are one of the easiest things to fix during a renovation, before the floor is closed up. Heating cable is laid out in an even grid to the manufacturer's spacing, tested, then locked in under a level screed bed ready for tiling.

Because the heating, screeding and tiling are handled by the same team, the cable layout, floor waste positions and finished tile level are coordinated from the start rather than worked around after the fact.

What’s included

  • Underfloor heating supplied and installed under new tiles
  • Cable laid out and tested before screeding
  • Coordinated with waterproofing and floor waste positions
  • Suited to bathroom floors and living area renovations
  • Finished with porcelain, marble or large-format tiling
Recent work

Underfloor Heating across the Eastern Suburbs.

Questions

Frequently asked

Can underfloor heating be added to an existing bathroom renovation?
Yes — it is installed at the screeding stage, so it fits naturally into a full bathroom renovation once the floor is stripped back and waterproofed.
Does underfloor heating affect the floor height?
It adds a small amount of build-up for the cable and screed bed, which is accounted for during set-out so door clearances and floor wastes still work correctly.
Which tiles work best over underfloor heating?
Porcelain and natural stone both conduct heat well and are the usual choice over underfloor heating — the same tiles used across the floor tiling work generally.

Ready to talk about underfloor heating?

Call or email Davide directly — no forms, no call centre. Tell him what you're planning and he'll give you a straight answer.